TTC Harvey Shop
TTC Harvey Shop Our team is actively working on the Siporex roof removal, installation of new steel decking, membrane roofing, metal roofing, removal and re-installation of glazing, skylight works, general demolition, electrical works throughout, metal siding, concrete work, structural steel, rough carpentry, painting, excavation & filling, off-street paving & asphalt and storm/sanitary drainage, mechanical works including plumbing, thermal insulation, vibration control, ductwork, air filtration, BACS (building automation control systems), and electrical works throughout the facility. SHARE ON SOCIAL MEDIA Project Details: TTC, City of Toronto Location: Toronto, ON Scope of Work: Roofing, glazing, demolition, electrical, siding, concrete, structural steel, carpentry, painting, excavation, paving, drainage, mechanical, insulation, vibration control, ductwork, air filtration, BACS, and general electrical works throughout the facility. Completion Date: 2023 TTC Harvey Shop SHARE ON SOCIAL MEDIA Our team is actively working on the Siporex roof removal, installation of new steel decking, membrane roofing, metal roofing, removal and re-installation of glazing, skylight works, general demolition, electrical works throughout, metal siding, concrete work, structural steel, rough carpentry, painting, excavation & filling, off-street paving & asphalt and storm/sanitary drainage, mechanical works including plumbing, thermal insulation, vibration control, ductwork, air filtration, BACS (building automation control systems), and electrical works throughout the facility. Project Details: TTC, City of Toronto Location: Toronto, ON Scope of Work: Roofing, glazing, demolition, electrical, siding, concrete, structural steel, carpentry, painting, excavation, paving, drainage, mechanical, insulation, vibration control, ductwork, air filtration, BACS, and general electrical works throughout the facility. Completion Date: 2023