[Cladding] Commercial

Yves Saint Laurent (YSL) – Toronto

Yves Saint Laurent (YSL) – Toronto​ Our Cladding team successfully did a renovation to existing store front at 110 Bloor Street West. SHARE ON SOCIAL MEDIA Project Details:  Location: Toronto, ON Scope of Work: Installation only of concrete panels and substructure to the exterior portion of the building Construction Manager: Structure Corp Owner: Yves Saint Laurent (YSL) Architect: dkstudio architects inc. Completion Date:  August, 2023  Yves Saint Laurent (YSL) – Toronto​ SHARE ON SOCIAL MEDIA Our Cladding team successfully did a renovation to existing store front at 110 Bloor Street West. Project Details:  Location: Toronto, ON Scope of Work: Installation only of concrete panels and substructure to the exterior portion of the building Construction Manager: Structure Corp Owner: Yves Saint Laurent (YSL) Architect: dkstudio architects inc. Completion Date:  August, 2023

Yves Saint Laurent (YSL) – Toronto Read More »

Eataly – Don Mills

Eataly – Don Mills Our cladding team successfully supplied and installed 18ga. galvanized steel studs spaced at 406mm [16″] O.C., Soprema sopraseal stick 1100t air/vapour barrier, fasteners, ultrashield plastic composite beam UH25 by Newtechwood (Peruvian Teak colour), ultrashield plastic composite UH61 Norwegian siding by Newtechwood (Black) , ACM panels (3mm thick. ACM PE Core, back routed, mitered corner, and SBR Bronze stock colour), extrusions ( fabricated from aluminum alloy 6063 temper T6 and mill finish), and filler strips (3mm thick ACM and same colour with adjacent panels). SHARE ON SOCIAL MEDIA Project Details: Architect: Hugo Arriojas – Studio Arriojas Location: North York, ON Scope of Work: Installation of ACM panels, steel studs, air/vapour barrier, fasteners, composite beams and siding, extrusions, and filler strips Completion Date: October, 2023 Eataly – Don Mills SHARE ON SOCIAL MEDIA Our cladding team successfully supplied and installed 18ga. galvanized steel studs spaced at 406mm [16″] O.C., Soprema sopraseal stick 1100t air/vapour barrier, fasteners, ultrashield plastic composite beam UH25 by Newtechwood (Peruvian Teak colour), ultrashield plastic composite UH61 Norwegian siding by Newtechwood (Black) , ACM panels (3mm thick. ACM PE Core, back routed, mitered corner, and SBR Bronze stock colour), extrusions ( fabricated from aluminum alloy 6063 temper T6 and mill finish), and filler strips (3mm thick ACM and same colour with adjacent panels). Project Details: Architect: Hugo Arriojas – Studio Arriojas Location: North York, ON Scope of Work:  Installation of ACM panels, steel studs, air/vapour barrier, fasteners, composite beams and siding, extrusions, and filler strips Completion Date: October, 2023

Eataly – Don Mills Read More »

Eataly – Sherway

Eataly – Sherway Gardens​ Our cladding team successfully supplied and installed CONCRETE-SKIN and OKO-SKIN Panels (mitered corners when required), black filter fabric, Z girts, 2″ Mineral -wool rigid insulation (R-8) at W2a Exterior Walls, 3″ Mineral -wool rigid insulation (R-8) at W3a Exterior Walls, Vapour Permeable water resistive barrier, insect Screen and flashing, and removable Prefinished Metal “U” Channel in bronze at jambs and headers of openings. SHARE ON SOCIAL MEDIA Project Details:  Architectural designs by Gensler Location: Etobicoke, ON Scope of Work: Installation of CONCRETE-SKIN and OKO-SKIN Panels.  Completion Date: March, 2023 Eataly – Sherway Gardens SHARE ON SOCIAL MEDIA Our cladding team successfully supplied and installed CONCRETE-SKIN and OKO-SKIN Panels (mitered corners when required), black filter fabric, Z girts, 2″ Mineral -wool rigid insulation (R-8) at W2a Exterior Walls, 3″ Mineral -wool rigid insulation (R-8) at W3a Exterior Walls, Vapour Permeable water resistive barrier, insect Screen and flashing, and removable Prefinished Metal “U” Channel in bronze at jambs and headers of openings. Location: Etobicoke, ON Scope of Work:  Installation of CONCRETE-SKIN and OKO-SKIN Panels.  Architect:  Architectural designs by Gensler Completion Date: March, 2023

Eataly – Sherway Read More »

Urbacon Data Centre Solutions · DC3

Urbacon Data Centre Solutions · DC3 Our cladding division supplied and installed flexible membrane where shown on architectural drawings, to tie outdoor equipment into siding membrane. All trimmers and flashings in prefinished metal to match the cladding as necessary to complete the work to industry standards most closely resembling the architectural detail. SHARE ON SOCIAL MEDIA Project Details Location: Richmond Hill, ON Scope of Work: Supplied and installed a flexible membrane as shown on architectural drawings to tie outdoor equipment into the siding membrane, with all trimmers and flashings made of prefinished metal to match the cladding and complete the work to industry standards closely resembling the architectural detail. Completion Date: April, 2021 Urbacon Data Centre Solutions · DC3 SHARE ON SOCIAL MEDIA Our cladding division supplied and installed flexible membrane where shown on architectural drawings, to tie outdoor equipment into siding membrane. All trimmers and flashings in prefinished metal to match the cladding as necessary to complete the work to industry standards most closely resembling the architectural detail. Project Details Location: Richmond Hill, ON Scope of Work: Supplied and installed a flexible membrane as shown on architectural drawings to tie outdoor equipment into the siding membrane, with all trimmers and flashings made of prefinished metal to match the cladding and complete the work to industry standards closely resembling the architectural detail. Completion Date: April, 2021

Urbacon Data Centre Solutions · DC3 Read More »

Chicopee Plaza

Chicopee Plaza Our roofing division did a partial replacement of the plaza roof with an inverted system, remove and reinstall the same existing corrugated siding, and supply equipment required for the installation. Project Details:  Location: Kitchener, ON Scope of Work: Partial Replacement of Plaza Roof with an Inverted System, Remove and Reinstall the same existing Corrugated Siding and Supply Equipment required for the Installation Completion Date: September, 2021 SHARE ON SOCIAL MEDIA

Chicopee Plaza Read More »

Scroll to Top