Cladding

Yves Saint Laurent (YSL) – Toronto

Yves Saint Laurent (YSL) – Toronto​ Our Cladding team successfully did a renovation to existing store front at 110 Bloor Street West. SHARE ON SOCIAL MEDIA Project Details:  Location: Toronto, ON Scope of Work: Installation only of concrete panels and substructure to the exterior portion of the building Construction Manager: Structure Corp Owner: Yves Saint Laurent (YSL) Architect: dkstudio architects inc. Completion Date:  August, 2023  Yves Saint Laurent (YSL) – Toronto​ SHARE ON SOCIAL MEDIA Our Cladding team successfully did a renovation to existing store front at 110 Bloor Street West. Project Details:  Location: Toronto, ON Scope of Work: Installation only of concrete panels and substructure to the exterior portion of the building Construction Manager: Structure Corp Owner: Yves Saint Laurent (YSL) Architect: dkstudio architects inc. Completion Date:  August, 2023

Yves Saint Laurent (YSL) – Toronto Read More »

Via Rail Maintenance Facility Upgrades

Via Rail Maintenance Facility Upgrades Our cladding team successfully supplied and installed 22ga. pre-finished metal siding by Agway 7-150, in charcoal or equivalent, with matching 22ga. galvanized flashings on the North, South, East, and West elevations of Bldg. A (Fuel Plant Support) and Bldg. G (VEMS Structures). Install 18ga. galvanized subgirts, semi-rigid insulation, AVB membrane, and stainless steel fasteners. All necessary equipment for installation will be provided. Project Details: VIA Rail Canada Location: Etobicoke, ON Scope of Work: Installed 22ga. pre-finished metal siding and matching galvanized flashings on all elevations of two buildings, along with 18ga. galvanized subgirts, semi-rigid insulation, AVB membrane, and stainless steel fasteners, providing all necessary installation equipment. Completion Date: March, 2023 SHARE ON SOCIAL MEDIA Via Rail Maintenance Facility Upgrades SHARE ON SOCIAL MEDIA Our cladding team successfully supplied and installed 22ga. pre-finished metal siding by Agway 7-150, in charcoal or equivalent, with matching 22ga. galvanized flashings on the North, South, East, and West elevations of Bldg. A (Fuel Plant Support) and Bldg. G (VEMS Structures). Install 18ga. galvanized subgirts, semi-rigid insulation, AVB membrane, and stainless steel fasteners. All necessary equipment for installation will be provided. Project Details: VIA Rail Canada Location: Etobicoke, ON Scope of Work: Installed 22ga. pre-finished metal siding and matching galvanized flashings on all elevations of two buildings, along with 18ga. galvanized subgirts, semi-rigid insulation, AVB membrane, and stainless steel fasteners, providing all necessary installation equipment. Completion Date: March, 2023

Via Rail Maintenance Facility Upgrades Read More »

Howard Park

38 HOWARD PARK The second phase of the Howard Park development adds 90 luxurious condominium units to the existing site with retail at grade. Designed with a friendly and interactive vibe inspired by tradition European courtyards, Howard Park 2 is intended to bring community together while minimizing environmental impact. The building successfully met the Toronto Green Standard Tier 2 requirements. SHARE ON SOCIAL MEDIA 38 HOWARD PARK SHARE ON SOCIAL MEDIA The second phase of the Howard Park development adds 90 luxurious condominium units to the existing site with retail at grade. Designed with a friendly and interactive vibe inspired by tradition European courtyards, Howard Park 2 is intended to bring community together while minimizing environmental impact. The building successfully met the Toronto Green Standard Tier 2 requirements. Project Details: Bike Storage     128 bicycle parking spaces are available at grade for building residents and visitors. Optimizing Urban Heat Island Performance     Using high-albedo surface materials to cover 100% of non-roof hardscape, the development greatly reduces its potential urban heat island effect, making its surrounding environment comfortably cooler. Optimized Irrigation Measures     Using a combination of high-efficiency irrigation systems and drought-tolerant plants contributes to an 82% reduction in water use for irrigation. Recycled Materials     Over 15% of the construction materials used for the development was derived from post and pre-consumer recycled sources by cost, reducing the environmental impact of resource production. Water Efficient Fixtures and Fittings      35% reduction in potable water consumption achieved through installation of low-flow plumbing fixtures. Location: Toronto, ON Scope of Work: Development, Energy, Bit mod Complete Date: 2017

Howard Park Read More »

Eataly – Don Mills

Eataly – Don Mills Our cladding team successfully supplied and installed 18ga. galvanized steel studs spaced at 406mm [16″] O.C., Soprema sopraseal stick 1100t air/vapour barrier, fasteners, ultrashield plastic composite beam UH25 by Newtechwood (Peruvian Teak colour), ultrashield plastic composite UH61 Norwegian siding by Newtechwood (Black) , ACM panels (3mm thick. ACM PE Core, back routed, mitered corner, and SBR Bronze stock colour), extrusions ( fabricated from aluminum alloy 6063 temper T6 and mill finish), and filler strips (3mm thick ACM and same colour with adjacent panels). SHARE ON SOCIAL MEDIA Project Details: Architect: Hugo Arriojas – Studio Arriojas Location: North York, ON Scope of Work: Installation of ACM panels, steel studs, air/vapour barrier, fasteners, composite beams and siding, extrusions, and filler strips Completion Date: October, 2023 Eataly – Don Mills SHARE ON SOCIAL MEDIA Our cladding team successfully supplied and installed 18ga. galvanized steel studs spaced at 406mm [16″] O.C., Soprema sopraseal stick 1100t air/vapour barrier, fasteners, ultrashield plastic composite beam UH25 by Newtechwood (Peruvian Teak colour), ultrashield plastic composite UH61 Norwegian siding by Newtechwood (Black) , ACM panels (3mm thick. ACM PE Core, back routed, mitered corner, and SBR Bronze stock colour), extrusions ( fabricated from aluminum alloy 6063 temper T6 and mill finish), and filler strips (3mm thick ACM and same colour with adjacent panels). Project Details: Architect: Hugo Arriojas – Studio Arriojas Location: North York, ON Scope of Work:  Installation of ACM panels, steel studs, air/vapour barrier, fasteners, composite beams and siding, extrusions, and filler strips Completion Date: October, 2023

Eataly – Don Mills Read More »

Eataly – Sherway

Eataly – Sherway Gardens​ Our cladding team successfully supplied and installed CONCRETE-SKIN and OKO-SKIN Panels (mitered corners when required), black filter fabric, Z girts, 2″ Mineral -wool rigid insulation (R-8) at W2a Exterior Walls, 3″ Mineral -wool rigid insulation (R-8) at W3a Exterior Walls, Vapour Permeable water resistive barrier, insect Screen and flashing, and removable Prefinished Metal “U” Channel in bronze at jambs and headers of openings. SHARE ON SOCIAL MEDIA Project Details:  Architectural designs by Gensler Location: Etobicoke, ON Scope of Work: Installation of CONCRETE-SKIN and OKO-SKIN Panels.  Completion Date: March, 2023 Eataly – Sherway Gardens SHARE ON SOCIAL MEDIA Our cladding team successfully supplied and installed CONCRETE-SKIN and OKO-SKIN Panels (mitered corners when required), black filter fabric, Z girts, 2″ Mineral -wool rigid insulation (R-8) at W2a Exterior Walls, 3″ Mineral -wool rigid insulation (R-8) at W3a Exterior Walls, Vapour Permeable water resistive barrier, insect Screen and flashing, and removable Prefinished Metal “U” Channel in bronze at jambs and headers of openings. Location: Etobicoke, ON Scope of Work:  Installation of CONCRETE-SKIN and OKO-SKIN Panels.  Architect:  Architectural designs by Gensler Completion Date: March, 2023

Eataly – Sherway Read More »

Urbacon Data Centre Solutions · DC3

Urbacon Data Centre Solutions · DC3 Our cladding division supplied and installed flexible membrane where shown on architectural drawings, to tie outdoor equipment into siding membrane. All trimmers and flashings in prefinished metal to match the cladding as necessary to complete the work to industry standards most closely resembling the architectural detail. SHARE ON SOCIAL MEDIA Project Details Location: Richmond Hill, ON Scope of Work: Supplied and installed a flexible membrane as shown on architectural drawings to tie outdoor equipment into the siding membrane, with all trimmers and flashings made of prefinished metal to match the cladding and complete the work to industry standards closely resembling the architectural detail. Completion Date: April, 2021 Urbacon Data Centre Solutions · DC3 SHARE ON SOCIAL MEDIA Our cladding division supplied and installed flexible membrane where shown on architectural drawings, to tie outdoor equipment into siding membrane. All trimmers and flashings in prefinished metal to match the cladding as necessary to complete the work to industry standards most closely resembling the architectural detail. Project Details Location: Richmond Hill, ON Scope of Work: Supplied and installed a flexible membrane as shown on architectural drawings to tie outdoor equipment into the siding membrane, with all trimmers and flashings made of prefinished metal to match the cladding and complete the work to industry standards closely resembling the architectural detail. Completion Date: April, 2021

Urbacon Data Centre Solutions · DC3 Read More »

Urbacon Data Centre Solutions · DC3

Urbacon Data Centre Solutions · DC3 Our cladding division supplied and installed flexible membrane where shown on architectural drawings, to tie outdoor equipment into siding membrane. All trimmers and flashings in prefinished metal to match the cladding as necessary to complete the work to industry standards most closely resembling the architectural detail. SHARE ON SOCIAL MEDIA Project Details Location: Richmond Hill, ON Scope of Work: Supplied and installed a flexible membrane as shown on architectural drawings to tie outdoor equipment into the siding membrane, with all trimmers and flashings made of prefinished metal to match the cladding and complete the work to industry standards closely resembling the architectural detail. Completion Date: April, 2021 Urbacon Data Centre Solutions · DC3 SHARE ON SOCIAL MEDIA Our cladding division supplied and installed flexible membrane where shown on architectural drawings, to tie outdoor equipment into siding membrane. All trimmers and flashings in prefinished metal to match the cladding as necessary to complete the work to industry standards most closely resembling the architectural detail. Project Details Location: Richmond Hill, ON Scope of Work: Supplied and installed a flexible membrane as shown on architectural drawings to tie outdoor equipment into the siding membrane, with all trimmers and flashings made of prefinished metal to match the cladding and complete the work to industry standards closely resembling the architectural detail. Completion Date: April, 2021

Urbacon Data Centre Solutions · DC3 Read More »

Humber LTC

Humber LTC Our metals division successfully installed an ACM panel system, Extruded Aluminum Cladding, metal cladding, and IMP Panels. Project Details:  Location: North York, ON Scope of Work: Cladding Completion Date: April, 2021 SHARE ON SOCIAL MEDIA

Humber LTC Read More »

Humber LTC

Humber LTC Our metals division successfully installed an ACM panel system, Extruded Aluminum Cladding, Metal Cladding, and IMP Panels. Project Details:  Location: North York, ON Scope of Work: Cladding Completion Date: April, 2021 SHARE ON SOCIAL MEDIA

Humber LTC Read More »

Trillium LTC Cladding Project of Triumph Group of Companies

Trillium LTC

Trillium LTC Our metals division installed ACM panels and wood-looking planks on walls and soffits. Project Details:  Location: Mississauga, ON Scope of Work: Cladding Completion Date: April, 2021 SHARE ON SOCIAL MEDIA

Trillium LTC Read More »