Cladding

Cladding

Via Rail Maintenance Facility Upgrades

Our cladding team successfully supplied and installed 22ga. pre-finished metal siding by Agway 7-150, in charcoal or equivalent, with matching 22ga. galvanized flashings on the North, South, East, and West elevations of Bldg. A (Fuel Plant Support) and Bldg. G (VEMS Structures). Install 18ga. galvanized subgirts, semi-rigid insulation, AVB membrane, and stainless steel fasteners. All necessary equipment for installation will be provided.

Project Details: VIA Rail Canada

Location: Etobicoke, ON

Scope of Work: Installed 22ga. pre-finished metal siding and matching galvanized flashings on all elevations of two buildings, along with 18ga. galvanized subgirts, semi-rigid insulation, AVB membrane, and stainless steel fasteners, providing all necessary installation equipment.

Completion Date: March, 2023

Via Rail Maintenance Facility Upgrades

Our cladding team successfully supplied and installed 22ga. pre-finished metal siding by Agway 7-150, in charcoal or equivalent, with matching 22ga. galvanized flashings on the North, South, East, and West elevations of Bldg. A (Fuel Plant Support) and Bldg. G (VEMS Structures). Install 18ga. galvanized subgirts, semi-rigid insulation, AVB membrane, and stainless steel fasteners. All necessary equipment for installation will be provided.

Project Details: VIA Rail Canada

Location: Etobicoke, ON

Scope of Work: Installed 22ga. pre-finished metal siding and matching galvanized flashings on all elevations of two buildings, along with 18ga. galvanized subgirts, semi-rigid insulation, AVB membrane, and stainless steel fasteners, providing all necessary installation equipment.

Completion Date: March, 2023

Scroll to Top

Share On Media

Request Quote

Please enable JavaScript in your browser to complete this form.
Click or drag a file to this area to upload.