Energy

Home Depot – 825 Caledonia Rd

Home Depot – 825 Caledonia Rd Triumph was EPC contractor, removed the existing Racking and Panels and replaced with new racking and panels. SHARE ON SOCIAL MEDIA Project Details: Home Depot Location: Toronto, ON Scope of Work: Removed the existing Racking and Panels and replaced with new racking and panels. Completion Date: March, 2019 Home Depot – 825 Caledonia Rd SHARE ON SOCIAL MEDIA Triumph was EPC contractor, removed the existing Racking and Panels and replaced with new racking and panels. Project Details: Home Depot Location: Toronto, ON Scope of Work: Removed the existing Racking and Panels and replaced with new racking and panels. Completion Date: March, 2019

Home Depot – 825 Caledonia Rd Read More »

Silverthorn Community School

Silverthorn Community School Triumph was the EPC contractor for this solar project Project Details: Location: Toronto, ON Scope of Work: Solar Panel Installation SHARE ON SOCIAL MEDIA Silverthorn Community School SHARE ON SOCIAL MEDIA Triumph was the EPC contractor for this solar project. Project Details: Location: Toronto, ON Scope of Work: Solar Panel Installation

Silverthorn Community School Read More »

Ashbridges Bay WTP Solar Project Triumph Group of Companies

Ashbridges Bay Wastewater Treatment Plant

Ashbridges Bay Wastewater Treatment Plant Triumph supplied and installed the Solar Wall system. SolarWall technology uses exterior solar panels to absorb solar energy, heating air between the panels and the building. This warmed air is directed into the ventilation system, cutting energy use, heating expenses, and carbon emissions. It’s a sustainable option for indoor heating and ventilation, enabling increased airflow without raising energy consumption or emissions. Project Details: Scope of Work: SolarWall Installation Location of Work: Toronto, ON SHARE ON SOCIAL MEDIA Ashbridges Bay Wastewater Treatment Plant SHARE ON SOCIAL MEDIA Triumph supplied and installed the SolarWall system. SolarWall technology uses exterior solar panels to absorb solar energy, heating air between the panels and the building. This warmed air is directed into the ventilation system, cutting energy use, heating expenses, and carbon emissions. It’s a sustainable option for indoor heating and ventilation, enabling increased airflow without raising energy consumption or emissions. Project Details: Scope of Work: SolarWall Installation Location of Work: Toronto, ON

Ashbridges Bay Wastewater Treatment Plant Read More »

Keelesdale Junior Public School

Keelesdale Junior Public School Triumph was the EPC contractor for this solar project Project Details: Location: Toronto, ON Scope of Work: Solar Panel Installation SHARE ON SOCIAL MEDIA Keelesdale Junior Public School SHARE ON SOCIAL MEDIA Triumph was the EPC contractor for this solar project. Project Details: Location: Toronto, ON Scope of Work: Solar Panel Installation

Keelesdale Junior Public School Read More »

George Vanier Secondary School

George Vanier Secondary School Triumph was the EPC contractor for this solar project Project Details: Location: Toronto, ON Scope of Work: Solar Panel Installation SHARE ON SOCIAL MEDIA George Vanier Secondary School SHARE ON SOCIAL MEDIA Triumph was the EPC contractor for this solar project. Project Details: Location: Toronto, ON Scope of Work: Solar Panel Installation

George Vanier Secondary School Read More »

C.D. Farquharson Junior Public School

C.D. Farquharson Junior Public School Triumph was the EPC contractor for this solar project Project Details: Location: Toronto, ON Scope of Work: Solar Panel Installation SHARE ON SOCIAL MEDIA C.D. Farquharson Junior Public School SHARE ON SOCIAL MEDIA Triumph was the EPC contractor for this solar project Project Details: Location: Toronto, ON Scope of Work: Solar Panel Installation

C.D. Farquharson Junior Public School Read More »

Solar and Roofing project - Roof replacement and reinstalling solar panel system

Home Depot – 50 Kirkham Drive Markham

Home Depot – 50 Kirkham Drive Markham Triumph was EPC contractor, removed the existing Solar System, safely secured the material on site, and reinstalled the Solar system working in tandem with Roof replacement activities Project Details: Scope of Work: Solar Panel Installation Location of Work: Markham, ON SHARE ON SOCIAL MEDIA Home Depot – 50 Kirkham Drive Markham SHARE ON SOCIAL MEDIA Triumph was EPC contractor, removed the existing Solar System, safely secured the material on site, and reinstalled the Solar system working in tandem with Roof replacement activities Project Details: Scope of Work: Solar Panel Installation Location of Work: Markham, ON

Home Depot – 50 Kirkham Drive Markham Read More »

Howard Park - Roofing Project of Triumph Group of Companies

Howard Park

24 & 38 HOWARD PARK The second phase of the Howard Park development adds 90 luxurious condominium units to the existing site with retail at grade. Designed with a friendly and interactive vibe inspired by tradition European courtyards, Howard Park 2 is intended to bring community together while minimizing environmental impact. The building successfully met the Toronto Green Standard Tier 2 requirements. SHARE ON SOCIAL MEDIA 24 & 38 HOWARD PARK SHARE ON SOCIAL MEDIA The second phase of the Howard Park development adds 90 luxurious condominium units to the existing site with retail at grade. Designed with a friendly and interactive vibe inspired by tradition European courtyards, Howard Park 2 is intended to bring community together while minimizing environmental impact. The building successfully met the Toronto Green Standard Tier 2 requirements. Project Details: Bike Storage     128 bicycle parking spaces are available at grade for building residents and visitors. Optimizing Urban Heat Island Performance     Using high-albedo surface materials to cover 100% of non-roof hardscape, the development greatly reduces its potential urban heat island effect, making its surrounding environment comfortably cooler. Optimized Irrigation Measures     Using a combination of high-efficiency irrigation systems and drought-tolerant plants contributes to an 82% reduction in water use for irrigation. Recycled Materials     Over 15% of the construction materials used for the development was derived from post and pre-consumer recycled sources by cost, reducing the environmental impact of resource production. Water Efficient Fixtures and Fittings      35% reduction in potable water consumption achieved through installation of low-flow plumbing fixtures. Location: Toronto, ON Scope of Work: Development, Energy, Bit mod Complete Date: 2017

Howard Park Read More »

Hickory Woods Public School

Hickory Woods Public School Our metals division completed the installation of skylight, solar panel and metal roof replacement at Hickory Woods. Project Details: Location: Mississaugua, ON Scope of Work: Skylight & Metal Roof Replacement + Solar Panel Installation SHARE ON SOCIAL MEDIA Hickory Woods Public School SHARE ON SOCIAL MEDIA Our metals division completed the installation of skylight, solar panel and metal roof replacement at Hickory Woods. Project Details: Location: Mississaugua, ON Scope of Work: Skylight & Metal Roof Replacement + Solar Panel Installation

Hickory Woods Public School Read More »

Scroll to Top