Restoration

St Mary’s General Hospital

St Mary’s General Hospital Our restoration team successfully did a roof rehabilitation that includes work above the ICU and operation facility, wet area replacement, and the application of Tremco Alpha guard Puma Coating Overlay. It also involves an Inverted TRA Roofing System Overlay, installation of new sheet metal flashing, and a ballasted guardrail system. The project will employ a minimal to zero odor roof application suitable for sub-zero weather conditions. Project Details: Location: Kitchener, ON Scope of Work: Wet area replacement, Tremco Alpha guard and TRA overlay, new sheet metal flashing, ballasted guardrail, minimal odor, sub-zero application Complete Date: April, 2024 SHARE ON SOCIAL MEDIA St Mary’s General Hospital SHARE ON SOCIAL MEDIA Our restoration team successfully did a roof rehabilitation that includes work above the ICU and operation facility, wet area replacement, and the application of Tremco Alpha guard Puma Coating Overlay. It also involves an Inverted TRA Roofing System Overlay, installation of new sheet metal flashing, and a ballasted guardrail system. The project will employ a minimal to zero odor roof application suitable for sub-zero weather conditions. Project Details: Location: Kitchener, ON Scope of Work: Wet area replacement, Tremco Alpha guard and TRA overlay, new sheet metal flashing, ballasted guardrail, minimal odor, sub-zero application. Complete Date: Novemeber, 2023

St Mary’s General Hospital Read More »

McMaster Nuclear Reactor Building Restoration

McMaster Nuclear Reactor Building Restoration Our restoration team completed 11,500 square feet of roof replacement, concrete wall repairs, and new elastomeric wall coating. This involved removing and replacing protective membranes on roofs, the cooling tower pit, and all exterior walls, as well as repairing damaged concrete. We installed a new roof assembly with a polyurethane membrane, reinforcement fabric, and polystyrene insulation, and reinstated the salvaged ballast. Repairs were made to concrete walls and hoist/emergency exit roof areas, followed by a protective coating. Project Details: Location: Hamilton, ON Scope of Work:  Removed membranes from various areas, installed a new roof assembly with polyurethane membrane and polystyrene insulation, reinstated the ballast, and repaired and coated concrete walls. Complete Date: July, 2020 <strong>Project Details:</strong> <strong>Location</strong><strong style=”font-size: 16px; font-style: normal;”>:</strong> Hamilton, ON <strong>Scope of Work:  </strong>Removed membranes from various areas, installed a new roof assembly with polyurethane membrane and polystyrene insulation, reinstated the ballast, and repaired and coated concrete walls. <strong>Complete Date:</strong> July, 2020 SHARE ON SOCIAL MEDIA McMaster Nuclear Reactor Building Restoration SHARE ON SOCIAL MEDIA Our restoration team completed 11,500 square feet of roof replacement, concrete wall repairs, and new elastomeric wall coating. This involved removing and replacing protective membranes on roofs, the cooling tower pit, and all exterior walls, as well as repairing damaged concrete. We installed a new roof assembly with a polyurethane membrane, reinforcement fabric, and polystyrene insulation, and reinstated the salvaged ballast. Repairs were made to concrete walls and hoist/emergency exit roof areas, followed by a protective coating. Project Details: Location: Hamilton, ON Scope of Work:  Removed membranes from various areas, installed a new roof assembly with polyurethane membrane and polystyrene insulation, reinstated the ballast, and repaired and coated concrete walls. Complete Date: July, 2020

McMaster Nuclear Reactor Building Restoration Read More »

Cladding Retrofit Project Triumph Group of Companies

TTC Harvey Shop

TTC Harvey Shop Our team is actively working on the Siporex roof removal, installation of new steel decking, membrane roofing, metal roofing, removal and re-installation of glazing, skylight works, general demolition, electrical works throughout, metal siding, concrete work, structural steel, rough carpentry, painting, excavation & filling, off-street paving & asphalt and storm/sanitary drainage, mechanical works including plumbing, thermal insulation, vibration control, ductwork, air filtration, BACS (building automation control systems), and electrical works throughout the facility. SHARE ON SOCIAL MEDIA Project Details: TTC, City of Toronto Location: Toronto, ON Scope of Work: Roofing, glazing, demolition, electrical, siding, concrete, structural steel, carpentry, painting, excavation, paving, drainage, mechanical, insulation, vibration control, ductwork, air filtration, BACS, and general electrical works throughout the facility. Completion Date: 2023 TTC Harvey Shop SHARE ON SOCIAL MEDIA Our team is actively working on the Siporex roof removal, installation of new steel decking, membrane roofing, metal roofing, removal and re-installation of glazing, skylight works, general demolition, electrical works throughout, metal siding, concrete work, structural steel, rough carpentry, painting, excavation & filling, off-street paving & asphalt and storm/sanitary drainage, mechanical works including plumbing, thermal insulation, vibration control, ductwork, air filtration, BACS (building automation control systems), and electrical works throughout the facility. Project Details: TTC, City of Toronto Location: Toronto, ON Scope of Work: Roofing, glazing, demolition, electrical, siding, concrete, structural steel, carpentry, painting, excavation, paving, drainage, mechanical, insulation, vibration control, ductwork, air filtration, BACS, and general electrical works throughout the facility. Completion Date: 2023 

TTC Harvey Shop Read More »

Industry Building, Exhibition

Industry Building- Exhibition Place Substitution of old Pitch base roof, with installation of a 2-ply modified bitumen membrane roof, TPO membrane, finishing with a Green Roof. Project Details: 109 899.53 sqft. Location: Toronto, ON Scope of Work: Mod Bit New Roof Installation, Green Roof Completion Date: December, 2023 SHARE ON SOCIAL MEDIA Industry building – Exhibition Place SHARE ON SOCIAL MEDIA Substitution of old Pitch base roof, with installation of a 2-ply modified bitumen membrane roof, TPO membrane, finishing with a Green Roof. Project Details: 109 899.53 sqft. Location: Toronto, ON Scope of Work: Mod Bit New Roof Installation, Green Roof Completion Date: December, 2023

Industry Building, Exhibition Read More »

TTC Old Eglinton Garage Roofing Project of Triumph Group of Companies

TTC Old Eglinton Garage

TTC Old Eglinton Garage Our roofing & general contracting division completed the roof replacement & work on structural beams, decking, fire sprinklers, carpentry, electrical, plumbing, masonry, dust partition, and mechanical works throughout this facility. Project Details:  Location: Toronto, ON Scope of Work: Roof Replacement & Work on Structural Beams, Decking, Fire Sprinklers, Carpentry, Electrical, Plumbing, Masonry, Dust Partition, & Mechanical Works Completion Date: May, 2020 SHARE ON SOCIAL MEDIA

TTC Old Eglinton Garage Read More »

Headwater Healthcare

Headwater Healthcare Our roofing division successfully completed an 17,600 sqft. mod bit roof replacement on Headwater HealthCare in Orangeville, ON Additionally, our restoration division completed work on this project. Project Details: Location: Orangeville, ON Scope of Work: Mod Bit Roof Replacement Complete Date: April, 2021 SHARE ON SOCIAL MEDIA Headwater Healthcare SHARE ON SOCIAL MEDIA Our roofing division successfully completed an 17,600 sqft. mod bit roof replacement on Headwater HealthCare in Orangeville, ON Additionally, our restoration division completed work on this project. Project Details: Location: Orangeville, ON Scope of Work: Mod Bit Roof Replacement Complete Date: April, 2021

Headwater Healthcare Read More »

Sunnybrook Health Sciences Centre (Holland Centre)

Sunnybrook Health Sciences Centre

Sunnybrook Health & Sciences Centre Our service division is dedicated to making your roof and investment last. Service experts are fully equipped to respond to 24 hour emergencies, inspections, maintenance and repair visits. Driven by innovation, expertise, and collaboration, this team will successfully extend the life of your roof. Additionally, our restoration division completed work on this project. SHARE ON SOCIAL MEDIA Project Details:  Location: Toronto, ON Completion Date: April, 2022

Sunnybrook Health Sciences Centre Read More »

Markham Stouffville Hospital

Markham Stouffville Hospital

Markham Stouffville Hospital Our cladding & roofing divisions successfully completed the metal cladding, new roof installation and roof replacement. Additionally, our restoration division completed work on this project. Project Details: Location: Markham, ON Scope of Work: Metal Cladding, New Roof Installation, Roof Replacement, Restoration Complete Date: February, 2014 SHARE ON SOCIAL MEDIA Markham Stouffville Hospital SHARE ON SOCIAL MEDIA Our cladding & roofing divisions successfully completed the metal cladding, new roof installation and roof replacement. Additionally, our restoration division completed work on this project.Project Details: Location: Markham, ON Scope of Work: Metal Cladding, New Roof Installation, Roof Replacement, Restoration Complete Date: February, 2014

Markham Stouffville Hospital Read More »

Industry Building, Exhibition

Industry Building- Exhibition Place Our roofing division is wrapping up our project at Industry Building. Triumph is the GC for this project and has self-performed the roof replacement and associated sheet metal works. The existing roofing assembly was replaced by New single ply Roofing system. The project execution superseded the customer’s expectation; both the consultant and the owner have acknowledged Triumph’s efforts and congratulated us for delivering this project successfully. Project Details: 109 899.53 sqft. Location: Toronto, ON Scope of Work: Mod Bit New Roof Installation, Green Roof Completion Date: December, 2023 SHARE ON SOCIAL MEDIA Industry building – Exhibition Place SHARE ON SOCIAL MEDIA Our roofing division is wrapping up our project at Industry Building. Triumph is the GC for this project and has self-performed the roof replacement and associated sheet metal works. The existing roofing assembly was replaced by New single ply Roofing system. The project execution superseded the customer’s expectation; both the consultant and the owner have acknowledged Triumph’s efforts and congratulated us for delivering this project successfully. Project Details: 109 899.53 sqft. Location: Toronto, ON Scope of Work: Mod Bit New Roof Installation, Green Roof Completion Date: December, 2023

Industry Building, Exhibition Read More »

Industry Building, Exhibition

Industry Building- Exhibition Place Substitution of old Pitch base roof, with installation of a 2-ply modified bitumen membrane roof, TPO membrane, finishing with a Green Roof. Project Details: 109 899.53 sqft. Location: Toronto, ON Scope of Work: Mod Bit New Roof Installation, Green Roof Completion Date: December, 2023 SHARE ON SOCIAL MEDIA Industry building – Exhibition Place SHARE ON SOCIAL MEDIA Substitution of old Pitch base roof, with installation of a 2-ply modified bitumen membrane roof, TPO membrane, finishing with a Green Roof. Project Details: 109 899.53 sqft. Location: Toronto, ON Scope of Work: Mod Bit New Roof Installation, Green Roof Completion Date: December, 2023

Industry Building, Exhibition Read More »

Scroll to Top