Our restoration team completed 11,500 square feet of roof replacement, concrete wall repairs, and new elastomeric wall coating. This involved removing and replacing protective membranes on roofs, the cooling tower pit, and all exterior walls, as well as repairing damaged concrete. We installed a new roof assembly with a polyurethane membrane, reinforcement fabric, and polystyrene insulation, and reinstated the salvaged ballast. Repairs were made to concrete walls and hoist/emergency exit roof areas, followed by a protective coating.
<strong>Project Details:</strong>
<strong>Location</strong><strong style=”font-size: 16px; font-style: normal;”>:</strong> Hamilton, ON
<strong>Scope of Work: </strong>Removed membranes from various areas, installed a new roof assembly with polyurethane membrane and polystyrene insulation, reinstated the ballast, and repaired and coated concrete walls.
<strong>Complete Date:</strong> July, 2020
McMaster Nuclear Reactor Building Restoration
Project Details:
Location: Hamilton, ON
Scope of Work: Removed membranes from various areas, installed a new roof assembly with polyurethane membrane and polystyrene insulation, reinstated the ballast, and repaired and coated concrete walls.
Complete Date: July, 2020