McMaster Nuclear Reactor Restoration project complete by Triumph Group of Companies

Our restoration team completed 11,500 square feet of roof replacement, concrete wall repairs, and new elastomeric wall coating. This involved removing and replacing protective membranes on roofs, the cooling tower pit, and all exterior walls, as well as repairing damaged concrete. We installed a new roof assembly with a polyurethane membrane, reinforcement fabric, and polystyrene insulation, and reinstated the salvaged ballast. Repairs were made to concrete walls and hoist/emergency exit roof areas, followed by a protective coating.

Project Details: Location: Hamilton, ON Scope of Work:  Removed membranes from various areas, installed a new roof assembly with polyurethane membrane and polystyrene insulation, reinstated the ballast, and repaired and coated concrete walls. Complete Date: July, 2020

<strong>Project Details:</strong>

<strong>Location</strong><strong style=”font-size: 16px; font-style: normal;”>:</strong> Hamilton, ON

<strong>Scope of Work:  </strong>Removed membranes from various areas, installed a new roof assembly with polyurethane membrane and polystyrene insulation, reinstated the ballast, and repaired and coated concrete walls.

<strong>Complete Date:</strong> July, 2020

McMaster Nuclear Reactor Restoration project complete by Triumph Group of Companies

McMaster Nuclear Reactor Building Restoration

Our restoration team completed 11,500 square feet of roof replacement, concrete wall repairs, and new elastomeric wall coating. This involved removing and replacing protective membranes on roofs, the cooling tower pit, and all exterior walls, as well as repairing damaged concrete. We installed a new roof assembly with a polyurethane membrane, reinforcement fabric, and polystyrene insulation, and reinstated the salvaged ballast. Repairs were made to concrete walls and hoist/emergency exit roof areas, followed by a protective coating.

Project Details:

Location: Hamilton, ON

Scope of Work:  Removed membranes from various areas, installed a new roof assembly with polyurethane membrane and polystyrene insulation, reinstated the ballast, and repaired and coated concrete walls.

Complete Date: July, 2020

Scroll to Top

Share On Media

Request Quote

Please enable JavaScript in your browser to complete this form.
Click or drag a file to this area to upload.
Please enable JavaScript in your browser to complete this form.
Click or drag a file to this area to upload.