Edit Template

Waterproofing

Waterproofing

TTC Chester Station

Our waterproofing division completed work on this project.

The project includes the supply and installation of a 2-ply SBS modified bituminous sheet membrane roofing system, with visual inspections scheduled during the second, fifth, tenth, and fifteenth years post-completion. It also involves installing prefinished metal flashings, preformed stack and membrane flashings, and all auxiliary components like sheet metal flashing and prefabricated sleeves and collars.  Additionally, the project covers the installation of Titanium Zinc alloy roofing on specified underlayment and sheathing.

Project Details: TTC, City of Toronto

Location: Toronto, ON

Scope of Work:  Supply and installation of a 2-ply SBS modified bituminous sheet membrane roofing system, with visual inspections scheduled for the second, fifth, tenth, and fifteenth years post-completion, as well as the installation of prefinished metal flashings, preformed stack and membrane flashings, auxiliary components such as sheet metal flashing and prefabricated sleeves and collars, and Titanium Zinc alloy roofing on specified underlayment and sheathing.

Completion Date:  2018

TTC Chester Station

Our waterproofing division completed work on this project. The project includes the supply and installation of a 2-ply SBS modified bituminous sheet membrane roofing system, with visual inspections scheduled during the second, fifth, tenth, and fifteenth years post-completion. It also involves installing prefinished metal flashings, preformed stack and membrane flashings, and all auxiliary components like sheet metal flashing and prefabricated sleeves and collars.  Additionally, the project covers the installation of Titanium Zinc alloy roofing on specified underlayment and sheathing.
Project Details: TTC, City of Toronto Location: Toronto, ON Scope of Work:  Supply and installation of a 2-ply SBS modified bituminous sheet membrane roofing system, with visual inspections scheduled for the second, fifth, tenth, and fifteenth years post-completion, as well as the installation of prefinished metal flashings, preformed stack and membrane flashings, auxiliary components such as sheet metal flashing and prefabricated sleeves and collars, and Titanium Zinc alloy roofing on specified underlayment and sheathing. Completion Date:  2018
Scroll to Top

Share On Media